• Applying BIM and 3D laser scanning technology on virtual pre-assembly for complex steel structure in construction 

      Ying, Chunli; Zhou, Yin; Han, Daguang; Qin, Guocheng; Hu, Kaixin; Guo, Jieming; Guo, Tong (IOP Conference Series: Earth and Environmental Science;Volume 371, Issue 2, Journal article; Peer reviewed, 2019)
      Steel structure needs to be assembled before the components are transported to the site to ensure the installation of the steel structure successfully. The traditional assembly is a physical assembly method, which needs ...
    • Applying BIM and 3D laser scanning technology on virtual pre-assembly for complex steel structure in construction 

      Ying, Chunli; Zhou, Yin; Han, Daguang; Qin, Guocheng; Hu, Kaixin; Guo, Jieming; Guo, Tong (IOP Conference Series: Earth and Environmental Science;371 (2019), 022036, Journal article; Peer reviewed, 2019)
      Steel structure needs to be assembled before the components are transported to the site to ensure the installation of the steel structure successfully. The traditional assembly is a physical assembly method, which needs ...
    • Automated reconstruction of parametric BIM for bridge based on terrestrial laser scanning data 

      Qin, Guocheng; Zhou, Yin; Hu, Kaixin; Han, Daguang; Ying, Chunli (Advances in Civil Engineering;Volume 2021, Journal article; Peer reviewed, 2021-01-08)
      Building information modeling (BIM) in industrialized bridge construction is usually performed based on initial design information. Differences exist between the model of the structure and its actual geometric dimensions ...
    • Integrating BIM and IoT for smart bridge management 

      Zhao, Zhenping; Gao, Yu; Hu, Xingyi; Zhou, Yin; Guocheng, Qin; Guo, Jieming; Liu, Yachao; Yu, Chenchen; Han, Daguang (IOP Conference Series: Earth and Environmental Science;Volume 371, Journal article; Peer reviewed, 2019)
      Considering high risk, long construction period, high construction and maintenance costs, bridge management is asynchronous, unintelligent and inefficient. The purpose of this research is to investigate a new approach with ...